土地开发

Guides, charges and rules for big developments\r\n

We’re committed to making sure new land developments receive quality water, wastewater and, where possible, stormwater infrastructure. We also need to be sure that new buildings don’t affect our pipes. That’s why we work closely with developers and their providers as part of our development process (297KB).

\r\n"}}" id="text-147f020695" class="cmp-text">

大型发展的指南,收费和规则

我们致力于确保新的土地开发获得优质的水,废水以及雨水基础设施。我们还需要确保新建筑不会影响我们的管道。这就是为什么我们与开发人员及其提供商紧密合作,作为我们的开发过程(297KB)

计划大型发展?
如果您计划大规模的土地重新分区,新的开发或重建项目,请致电我们13 20 92咨询。要求城市,成长与发展团队。


Charges\r\n

Before you can get your Section 73 Compliance Certificate, you may have to pay:

\r\n
    \r\n
  • developer charges
  • \r\n
  • the cost of constructing new pipes – you generally pay for the full cost, but sometimes Sydney Water will pay.
  • \r\n
\r\n"}}" id="ID01" class="cmp-text">

指控

在获得第73条合规证书之前,您可能必须支付:

  • 开发人员收费
  • 建造新管道的成本 - 您通常支付全部费用,但有时悉尼水会支付。

\r\nWho pays, and other costs\r\n

The decision on who pays is based on our Funding infrastructure to service growth policy. If Sydney Water pays for any of these works, you must follow our procurement guidelines. Your water servicing coordinator can tell you more.

\r\n

There may be other costs you’ll have to pay for during the land development process. These could include:

\r\n
    \r\n
  • checking building plans 
  • \r\n
  • connecting to our pipes, such as water main drilling costs
  • \r\n
  • assessing water mains for fire-fighting capabilities
  • \r\n
  • discharging trade waste
  • \r\n
  • inspecting plumbing and drainage.
  • \r\n
\r\n

Read more about current Prices for other services. You’ll also have to pay your providers for their services. Remember, you can only use our listed providers.

\r\n"}}" id="text-bc20ab5bd3" class="cmp-text">


谁付款和其他费用

关于谁支付的决定是基于我们的为服务增长政策提供资金。如果悉尼水为这些作品付费,则必须遵循我们的采购准则。您的水服务协调员可以告诉你更多。

在土地开发过程中,您可能还需要支付其他费用。这些可能包括:

  • 检查建筑计划
  • 连接到我们的管道,例如水主钻孔成本
  • 评估水管的消防能力
  • 解除贸易浪费
  • 检查管道和排水。

阅读有关当前的更多信息其他服务的价格。您还必须向提供商支付其服务。记住,你只能使用我们的列出的提供商

 \r\n

About developer charges
\r\n

\r\n

The only developer charge you have to pay is for recycled water. Find out how this is calculated in the Rouse Hill recycled water services: Development servicing plan 2021 and the Hoxton Park recycled water services: Development servicing plan 2021.

\r\n

IPART (the Independent Pricing and Regulatory Tribunal) sets the way recycled water developer charges are calculated. It includes a CPI adjustment on 1 July each year, and you must pay the charge that applies when you pay.

\r\n

Recycled water charges for a development can add up to thousands of dollars. Charges depend on the size and location of the project. We’ll tell you about these charges in the Notice of Requirements letter you get from your water servicing coordinator.

\r\n"}}" id="text-9424d26f9a" class="cmp-text">

关于开发人员的费用

您必须支付的唯一开发人员收费是回收水。找出如何在Rouse Hill回收水服务:开发服务计划2021Hoxton Park回收水服务:开发服务计划2021

ipart(独立的定价和监管法庭)设置了回收水开发人员的收费的方式。它包括每年7月1日的CPI调整,您必须支付付款时适用的费用。

开发的回收水费用总计数千美元。费用取决于项目的大小和位置。我们将在您从水服务协调员那里获得的要求通知书中告诉您这些费用。


Essential references\r\n

Policies

\r\n

For our policies on the requirements we make during the land development process, look under ‘Plumbing, building and developing’ on our Policies page.
\r\n 

\r\n

Guidelines

\r\n\r\n


\r\nOther information

\r\n\r\n

 

\r\n"}}" id="ID02" class="cmp-text">

基本参考

政策

对于我们在土地开发过程中提出的要求的政策,请在“管道,建造和发展”下进行。政策页。

准则


其他信息

土地开发指南(618KB)
一切都在这里:如何满足我们为开发服务的要求,并通过我们的“管理新开发”过程获得第73条证书。它详细介绍了过程,相关政策,表格,费用和费用。


Rules about relocating pipes\r\n

You mustn’t start work to move, remove or replace any Sydney Water pipes until you have our approval, including temporary replacement pipes.  You need to engage a water servicing coordinator and lodge an approval application through the e-Developer system. Include a design of the proposed works and any temporary pipework. We’ll review the design and tell you what you need to do to get our approval. This might include lodging a construction bond.

\r\n

Take a look at our Asset adjustment and protection manual and find out more.

\r\n"}}" id="ID03" class="cmp-text">

关于重新搬运管的规则

在获得我们的批准之前,您不得开始工作以移动,卸下或更换任何悉尼水管,包括临时替换管道。您需要参与水服务协调员并通过电子开发人员系统提出批准申请。包括拟议作品和任何临时管道的设计。我们将查看设计,并告诉您您需要做什么才能获得我们的认可。这可能包括建立建筑债券。

看看我们的资产调整和保护手册了解更多


How to track your applications\r\n

You can follow your applications for Section 73 certificates or approvals to move or extend our pipes at developer application progress.

\r\n"}}" id="ID04" class="cmp-text">

如何跟踪您的应用程序

您可以关注第73条证书或批准的申请,以移动或扩展我们的管道开发人员应用程序进度


Baidu
map