开发人员契据和标准条款

Rules about moving, removing or replacing water pipes\r\n

If you need to move, extend or protect our pipes and assets for your development, including temporary replacement pipes, you and your providers must enter into a Developer Works Deed with us. You need to engage a water servicing coordinator and lodge an application through the e-Developer system. This includes completing all our developer deed schedules.

\r\n"}}" id="text-8fd138de13" class="cmp-text">

关于移动,卸下或更换水管的规则

如果您需要移动,扩展或保护我们的开发管道和资产,包括临时替换管道,则您和您的提供商必须与我们一起进入开发人员的作品契约。您需要参与水服务协调员并通过电子开发器系统提出应用程序。这包括完成我们所有的开发人员契约时间表。

土地开发指南
一切都在这里:如何满足我们为开发服务的要求,并通过我们的“管理新开发”过程获得第73条证书。它详细介绍了过程,相关政策,表格,费用和费用。


Developer Works Deed\r\n

If you need to move, extend or protect our pipes and assets for your development, you and your providers need to enter into a Developer Works Deed (380KB) with us.

\r\n
    \r\n
  • You and your providers must sign the Developer Works Deed before you submit the design of works.
  • \r\n
  • If you haven’t engaged your constructor by the time you submit the design, the deed must still be submitted with all the other signatures so we can execute it. 
  • \r\n
  • Before construction begins, your constructor must sign the Schedule 3: Deed Poll.
  • \r\n
\r\n"}}" id="ID01" class="cmp-text">

开发人员工作契约

如果您需要移动,扩展或保护我们的开发管道和资产,您和您的提供者需要进入开发人员作品契约(380KB)和我们。

  • 在提交作品设计之前,您和您的提供商必须签署开发人员的作品契约。
  • 如果您在提交设计时尚未订婚构造函数,则契约仍然必须与所有其他签名一起提交,以便我们可以执行它。
  • 在施工开始之前,您的构造函数必须签署附表3:契据民意调查

Schedule 1: Standard Terms\r\n

You’ll find all the Developer Works Deed conditions in the Schedule 1: Standard Terms document (552KB).

\r\n"}}" id="ID02" class="cmp-text">

附表1:标准条款

您会发现所有开发人员在附表1:标准条款文档(552KB)


Schedule 2: Novation Deed\r\n

If you need to transfer ownership of the development site after you’ve signed the Developer Works Deed, you should complete the Schedule 2: Novation Deed (356KB).

\r\n"}}" id="ID03" class="cmp-text">

附表2:新事迹

如果您在签署开发人员的作品契据后需要转移开发网站的所有权,则应完成附表2:新事迹(356KB)


Schedule 3: Deed Poll\r\n

Your constructor must sign Schedule 3: Deed Poll (320KB) before construction starts.

\r\n"}}" id="ID04" class="cmp-text">

附表3:契据民意调查

您的构造函数必须签名附表3:契据民意调查(320KB)在施工开始之前。


Baidu
map