开发商契约和标准条款

Rules about moving, removing or replacing water pipes\r\n

If you need to move, extend or protect our pipes and assets for your development, including temporary replacement pipes, you and your providers must enter into a Developer Works Deed with us. You need to engage a water servicing coordinator and lodge an application through the e-Developer system. This includes completing all our developer deed schedules.

\r\n"}}" id="text-8fd138de13" class="cmp-text">

关于移动、拆卸或更换水管的规定

如果您需要为您的开发移动、扩展或保护我们的管道和资产,包括临时更换管道,您和您的供应商必须与我们签订一份开发人员工作契约。你需要聘用水务协调专员,并透过电子发展商系统递交申请。这包括完成我们所有的开发商契约时间表。

土地发展指南
这些都在这里:如何满足我们为您的开发服务的要求,并通过我们的“管理新开发”流程获得您的第73节证书。它详细说明了程序、相关政策、表格、费用和收费。


Developer Works Deed\r\n

If you need to move, extend or protect our pipes and assets for your development, you and your providers need to enter into a Developer Works Deed (380KB) with us.

\r\n
    \r\n
  • You and your providers must sign the Developer Works Deed before you submit the design of works.
  • \r\n
  • If you haven’t engaged your constructor by the time you submit the design, the deed must still be submitted with all the other signatures so we can execute it. 
  • \r\n
  • Before construction begins, your constructor must sign the Schedule 3: Deed Poll.
  • \r\n
\r\n"}}" id="ID01" class="cmp-text">

发展商工程契约

如果你需要移动,扩展或保护我们的管道和资产为您的发展,您和您的供应商需要进入一个发展商工程契约(380KB)和我们在一起。

  • 在提交设计作品之前,你和你的供应商必须签署《发展商工程契据》。
  • 如果你在提交设计时还没有聘请你的建筑师,契约还是必须连同其他所有签名一起提交,这样我们才能执行它。
  • 施工开始前,构造器必须签署附表3:契约投票

Schedule 1: Standard Terms\r\n

You’ll find all the Developer Works Deed conditions in the Schedule 1: Standard Terms document (552KB).

\r\n"}}" id="ID02" class="cmp-text">

附录1:标准条款

你可以在附表1:标准条款文件(552KB)


Schedule 2: Novation Deed\r\n

If you need to transfer ownership of the development site after you’ve signed the Developer Works Deed, you should complete the Schedule 2: Novation Deed (356KB).

\r\n"}}" id="ID03" class="cmp-text">

附表2:更新契约

如果你在签署发展商工程契约后,需要转让发展地盘的业权,你应填妥附表2:更新契约(356KB)


Schedule 3: Deed Poll\r\n

Your constructor must sign Schedule 3: Deed Poll (320KB) before construction starts.

\r\n"}}" id="ID04" class="cmp-text">

附表3:契约投票

您的构造函数必须签名附表3:契约投票(320KB)在施工开始之前。


Baidu
map