Are you planning to build or getting ready to excavate? Before you start, you’ll need to check where our pipes are located, get your plans approved by us and make sure you can get connected.

\r\n"}}" id="text-66c923c40c" class="cmp-text">

如果您正在建造或挖掘

您是否打算建造或准备挖掘?在开始之前,您需要检查我们的管道的位置,让您的计划得到我们的批准,并确保您可以连接。


1. Be prepared\r\n

If you’re building a new home, retaining wall, garage or some other structure you’ll need to get our approval first. This is to make sure what you’re building doesn’t impact our assets: our pipes, structures and easements. Our assets can be affected if your works will be over or next to themYou’ll also need to know what water, wastewater and stormwater services your building will need. You may need to construct something to meet our servicing requirements.

\r\n

How to locate our assets

\r\n\r\n"}}" id="ID01" class="cmp-text">

1.准备

如果您要建造新房,挡土墙,车库或其他一些结构,则首先需要获得我们的批准。这是为了确保您的建设不会影响我们的资产:我们的管道,结构和地役权。如果您的工作将会影响我们的资产在他们旁边或旁边您还需要知道您的建筑物将需要什么水,废水和雨水服务。您可能需要构建一些东西来满足我们的服务要求。

如何找到我们的资产

检查您是否需要理事会批准
联系您的地方议会,以了解您的建筑物或发掘是否需要开发同意。如果是这样,理事会可能不允许您在批准建筑计划之前开始建设。


2. Get your plans approved\r\n

Sydney Water needs to approve your building plansYour building or excavation may also need consent or approval from your council or local authority. Check with the council. They may have conditions you have to meet before they give consent. They may ask you to apply for a Section 73 Compliance Certificate, which certifies you have adequate access to water and wastewater services. 

\r\n

You can submit your plans online at Sydney Water Tap in.

\r\n"}}" id="ID02" class="cmp-text">

2.获取您的计划批准

悉尼水需要批准您的建筑计划您的建筑物或发掘也可能需要您的理事会或地方当局的同意或批准。与理事会联系。他们可能有您必须满足的条件,然后才能同意。他们可能会要求您申请第73条的合规证书,该证书证明您有足够的水和废水服务。

您可以在线提交计划悉尼水龙头


3. Budget for additional costs\r\n

Remember, you may have to pay for various costs, such as:

\r\n
    \r\n
  • checking building plans
  • \r\n
  • connecting to our pipes, for example, water main drilling costs
  • \r\n
  • assessing water mains for firefighting capabilities
  • \r\n
  • discharging trade waste
  • \r\n
  • inspecting plumbing and drainage.
  • \r\n
\r\n

To find out more, visit Prices for other services and Applications and approvals.

\r\n"}}" id="ID03" class="cmp-text">

3.预算额外费用

请记住,您可能必须支付各种费用,例如:

  • 检查建筑计划
  • 连接到我们的管道,例如水主钻孔成本
  • 评估水管的消防能力
  • 解除贸易浪费
  • 检查管道和排水。

要了解更多信息,请访问其他服务的价格申请和批准


4. Apply for a Section 73 Compliance Certificate\r\n

You may not need a Section 73 Compliance Certificate if you’re knocking down and replacing a residential dwelling, but there are certain types of development that need a Section 73 Certificate. This certificate is to make sure your building or excavation has, at a minimum:

\r\n
    \r\n
  • frontage to a drinking water main to connect a metered property service
  • \r\n
  • a wastewater connection point for each lot at least one metre inside each lot boundary.
  • \r\n
\r\n

It’s proof for your council that your project has access to Sydney Water’s water, wastewater and stormwater system. It also confirms that you’ve paid any necessary contributions towards existing infrastructure.

\r\n"}}" id="ID04" class="cmp-text">

4.申请第73条合规证书

您可能不需要第73条合规证书如果您要撞倒并取代住宅,但是有某些类型的发展需要第73条证书。该证书是为了确保您的建筑物或发掘至少具有:

  • 正面到饮用水主,连接计量的物业服务
  • 每个批次边界内每个批次至少一个米的废水连接点。

您的理事会证明您的项目可以使用悉尼水的水,废水和雨水系统。它还确认您已经为现有基础设施付出了任何必要的贡献。

跟踪您的应用程序
如果您通过悉尼水开发人员直接申请,请登录悉尼水龙头。如果您通过水服务协调员申请,请转到开发人员应用程序进度


5. Connect or disconnect \r\n

Ask your plumber to apply for approval for connections and disconnections from the water or wastewater systems at Sydney Water Tap in. If you’re connecting a business that produces commercial trade wastewater or industrial trade wastewater, you must get our permission before you connect and discharge to our wastewater system.

\r\n"}}" id="ID05" class="cmp-text">

5.连接或断开连接

要求您的水管工申请批准连接和断开连接从悉尼水龙头的水或废水系统中。如果您正在连接生产的业务商业的贸易废水或者工业贸易废水,您必须在连接并解散我们的废水系统之前获得我们的许可。


6. Install a meter\r\n

A meter must be installed within 2 days after connection. It must be close to the front and side boundaries of your property and accessible at all times. How you get a meter depends on the service the property has. We provide free meters for most properties. We’ll also install meters up to 50mm light duty for free, except for multi-level buildings. For larger meters, you’ll have to engage a plumber.

\r\n"}}" id="ID06" class="cmp-text">

6.安装仪表

连接后2天内必须安装一个仪表。它必须靠近您财产的前部和侧边界,并且始终可访问。您如何获得仪表取决于属性的服务。我们为大多数属性提供免费仪表。除了多层建筑物。对于较大的仪表,您必须参与水管工。